Final Environmental Assessment for Construction and Operation of a 31-meter Baffled Pistol Range at the New Hampshire National Guard Training Site, Center Strafford, New Hampshire

Final Environmental Assessment for Construction and Operation of a 31-meter Baffled Pistol Range at the New Hampshire National Guard Training Site, Center Strafford, New Hampshire
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:919634629
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Final Environmental Assessment for Construction and Operation of a 31-meter Baffled Pistol Range at the New Hampshire National Guard Training Site, Center Strafford, New Hampshire by :

Download or read book Final Environmental Assessment for Construction and Operation of a 31-meter Baffled Pistol Range at the New Hampshire National Guard Training Site, Center Strafford, New Hampshire written by and published by . This book was released on 2015 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: "The purpose of the proposed action is to construct a range facility in order to provide the NHARNG units the opportunity to fulfill their marksmanship requirements as identified in the Department of the Army pamphlet 350-38 in Standards Training Commission dated 18 November 2013, without the need for travel to installations located outside the state of New Hampshire." --SP-ii.


Final Environmental Assessment for Construction and Operation of a 31-meter Baffled Pistol Range at the New Hampshire National Guard Training Site, Center Strafford, New Hampshire Related Books

Final Environmental Assessment for Construction and Operation of a 31-meter Baffled Pistol Range at the New Hampshire National Guard Training Site, Center Strafford, New Hampshire
Language: en
Pages:
Authors:
Categories: Environmental impact analysis
Type: BOOK - Published: 2015 - Publisher:

DOWNLOAD EBOOK

"The purpose of the proposed action is to construct a range facility in order to provide the NHARNG units the opportunity to fulfill their marksmanship requirem
Final Environmental Assessment for Land Acquisition, Construction and Operation of New Hampshire Regional Training Institute, 195th Training Regiment, New Hampshire Army National Guard
Language: en
Pages:
Authors: New Hampshire. National Guard
Categories: Cumulative effects assessment (Environmental assessment)
Type: BOOK - Published: 2009 - Publisher:

DOWNLOAD EBOOK

Final Draft
Language: en
Pages:
Authors: AMEC Environment & Infrastructure, Inc
Categories: Environmental impact analysis
Type: BOOK - Published: 2013 - Publisher:

DOWNLOAD EBOOK

"The purpose of the proposed action is to ensure that effective, long-term natural resource conservation measures and military activities on mission land are in
Final Environmental Assessment for Construction and Operation of a Field Maintenance Shop - Hooksett, New Hampshire
Language: en
Pages:
Authors:
Categories: Military bases, American
Type: BOOK - Published: 2016 - Publisher:

DOWNLOAD EBOOK

This environmental assessment (EA) evaluates the potential environmental, cultural, and socioeconomic effects associated with contruction and operation of a pro
Draft Environmental Assessment for Construction and Operation of a Remote Electric Targetry System Multipurpose Transition Firing Range at Yakima Training Center by the Washington Army National Guard
Language: en
Pages:
Authors: United States. National Guard Bureau
Categories: Bombing and gunnery ranges
Type: BOOK - Published: 1994 - Publisher:

DOWNLOAD EBOOK

This document is an environmental assessment for the construction and use of a multipurpose transition firing range by the Washington Army National Guard (WAARN